August 27, 2013 No Responses

Custom built roof rack

We’re building almost anything and everything.  This time we’re working on a custom built roof rack.  We had completed the design work for this roof rack a few weeks ago, it was a collaborative project with the customer as he had quite a few requirements.  Once all the requirements were listed a 3D model and subsequent drawing was created, the drawing was reviewed and the build process began.  The advantage of designing it is that we could figure out the actual mass, in this case 47.55lbs (not factoring in the weight of welding filler).  The rack uses a Ø1-1/4″ perimeter hoop and seven Ø1″ horizontal crossbars.   Here’s the 3D rendering of the roof rack.  The tab at the rear is for an LED powered flood light, the two tabs at the front are for a LED light bar.

roofrackassembly

All the plate pieces were cut on the CNC table and prepped for welding to the rack.

Mint Design

Here are the pieces laid out on the shop floor prior to tacking and welding the main hoop and the coped Ø1″ tubes.  Also notice all tube ends/mating faces are sanded prior to TIG welding, this ensures a high quality structurally sound weld.  All joints were wiped down with alcohol prior to welding as well.

custom roof rack

There are a lot of things we can do at Mint Design, some of which we don’t advertise until we have a few projects go through using the new piece of equipment or technique.  In this case it’s tube and pipe bending.  We will be adding this to our list of services in the near future.

Here are the CNC cut mounting plates TIG welded from the underside of the rack.  The nice thing about designing with CAD is that everything just “fits”.  There is no slop and everything lines up.  The time spent on the computer saves us more time in the shop so in most cases it’s saving the customer money if it’s designed properly from the get go.  In this case the use of Ø1″ crossbar tubes along with the Ø1-1/4″ perimeter tube is that the 11ga steel plates fit up nearly flush with the outside tube once welded to the Ø1″ crossbars.

TIG weld CNC cut

100% TIG welded at all the connections.

TIG weld tubing

One thing to note, to speed up fabrication as well as improve accuracy and consistency we CNC cut a pair of tubing spacing jigs.  This allows us to make sure the rungs are evenly spaced from front to back and from side to side.  This eliminates any guesswork and makes fabrication work that much easier.  Here’s  a shot of the super simple jigs.

IMG_0774

And here is a picture of the finished rack installed.  The light bar on the front wasn’t snugged down yet…  The customer is going to have the rack powdercoated.  One neat feature about the rack is that it can accept a double set of gutter mounts to distribute any extreme loads evenly across the gutter rail.

IMG_0784

Comments are closed.